Task #19281
openTask #19245: Sprint Planning for 19/01/2026 - 30/01/2026
House Bill of Lading (HBL) Repository – Ocean Freight
0%
Description
House Repo ocean.xlsx - Proposed Template
The Operations officer wants a centralized repository to view, search, and manage House Bills of Lading (HBL) for ocean shipments, so that they can efficiently track shipments, verify shipment parties, understand routing, link to Master Bills of Lading (MBLs), and rely on accurate, up-to-date data for operational and audit purposes.
Acceptance Criteria
1. Repository View
- The system displays a tabular list of all HBL records for ocean shipments.
- Each record shows:
(a) HBL Reference
(b) MBL Reference
(c) Shipper
(d) Consignee
(e) Port of Loading
(f) Port of Destination
- The list loads by default when the repository screen is opened.
2. Search Functionality
-
Users can search by:
-
A search field is available on the repository screen.
(a) HBL Reference
(b) MBL Reference
-
Matching results are displayed in real-time or upon search action.
-
If no records are found, an appropriate message is displayed.
3. Shipment Parties & Routing
- Shipper and Consignee names are displayed for each HBL record, in a readable, non-truncated format.
- Port of Loading and Port of Destination are displayed as separate columns, following standardized port naming conventions.
- Data for parties and ports matches the linked HBL and shipment records.
4. Linkage to Master Bill of Lading
- Each HBL displays its corresponding MBL reference.
- Multiple HBLs can share the same MBL reference, accurately reflecting consolidation (LCL) scenarios.
5. Access to Detailed HBL Records
- Clicking an HBL reference opens the detailed HBL screen in view mode.
- The correct HBL data is loaded for further review or management.
6. Data Accuracy & Maintenance
- Only valid and active HBL records for ocean shipments are displayed.
- Data updates are reflected in real-time or after a refresh.
- Deleted HBLs are excluded from the repository.
GitLab Sync Log
[]
Updated by Redmine Admin about 1 month ago
- Due date changed from 01/14/2026 to 01/30/2026
- Parent task set to #19245
- gitlab project trace set to Sprint Planning for 19/01/2026 - 30/01/2026
Updated by Redmine Admin 8 days ago
- Due date changed from 01/30/2026 to 01/14/2026
- Estimated time changed from 0:00 h to 40:00 h