Project

General

Profile

Actions

Task #18398

closed

Task #18500: Ocean Sprint Planning for 17/07/2025 - 25/07/2025

Transmission of Manifest - House manifest for Bulk (LCL/LCL)

Added by Redmine Admin 6 months ago. Updated about 1 hour ago.

Status:
Closed
Priority:
Normal
Assignee:
-
Start date:
06/23/2025
Due date:
06/23/2025
% Done:

100%

Estimated time:
1:00 h
Spent time:
GitLab ID:
2860
GitLab Milestone:
GitLab Ticket Number:
693
GitLab Time Logged:
3600
Lock Timeline Date:
No
gitlab project trace:
Ocean Sprint Planning for 17/07/2025 - 25/07/2025

Description

Dear Al-Shad,

 

Please note that the testing of the Bulk manifest (LCL/LCL) has been completed.

 

Below are the key observations and findings:

 

Sequence of Events:

  • The master manifest for Bulk was successfully created on CCS.
  • The vessel was registered on FFS using EDL credentials.
  • Shipment costs for Bulk (EDL25MSFE06010) were generated.
  • The file reference was created using the LCL option.
  • An attempt was made to transmit the manifest; however, the House manifest failed to integrate into CCS.

 

Error Details:

Wrong Manifest Type provided. Manifest Type can only be of BULK (LCL/LCL).
ATP: ATP25002106 - HOMA Reference: EDL25SFI06004

 

Observations:

  • The failure to integrate the manifest was due to an incorrect manifest type. Specifically, the file was generated with the type FCL/LCL instead of LCL/LCL.

 

However, another test has been done to generate the manifest with the correct type (LCL/LCL) but this time, I’ve ticked “Co-Loaded” while creating the file reference and the manifest has been successfully generated and integrated on CCS.

 

Thanks to note that we cannot used the option “Co-loading” on file reference since in that particular case we don’t have any Co-load.

 

Thanks to check and revert if you need further information.

 

Regards,

 

Faez


GitLab Sync Log

[{"id": "25781", "author": "Al-Shad Isaac", "hours": 0.5, "created": "2025-06-25T11:07:40.249Z", "log_date": "2025-06-25", "comment": "Imported from GitLab by @Al-Shad Isaac on 2025-06-25T11:07:40.249Z: 30m-(0.5)h spend at: 2025-06-25", "status": "active", "deleted_by": "", "redmine_entry_id": 9749}, {"id": "25940", "author": "Vishesh Jodhoa", "hours": 0.5, "created": "2025-06-30T06:47:44.046Z", "log_date": "2025-06-30", "comment": "Imported from GitLab by @Vishesh Jodhoa on 2025-06-30T06:47:44.046Z: 30m-(0.5)h spend at: 2025-06-30", "status": "active", "deleted_by": "", "redmine_entry_id": 9800}]

Actions #1

Updated by Redmine Admin 6 months ago

  • GitLab Sync Log updated (diff)
Actions #2

Updated by Redmine Admin 6 months ago

  • GitLab Time Logged changed from 0 to 1800
Actions #3

Updated by Redmine Admin 6 months ago

  • GitLab Sync Log updated (diff)
Actions #4

Updated by Redmine Admin 5 months ago

  • Status changed from New to Development Done
  • % Done changed from 0 to 50
  • Estimated time changed from 0:00 h to 1:00 h
Actions #5

Updated by Redmine Admin 5 months ago

  • % Done changed from 50 to 100
  • GitLab Time Logged changed from 1800 to 3600
Actions #6

Updated by Redmine Admin 5 months ago

  • GitLab Sync Log updated (diff)
Actions #7

Updated by Redmine Admin 5 months ago

  • Status changed from Development Done to QA
Actions #8

Updated by Redmine Admin 3 months ago

  • Parent task set to #18500
  • gitlab project trace set to Ocean Sprint Planning for 17/07/2025 - 25/07/2025
Actions #9

Updated by Redmine Admin 2 days ago

  • Status changed from QA to Closed
Actions

Also available in: Atom PDF