Task #16854
closedTask #16323: Ocean Sprint Planning for 19/05/2025 - 30/05/2025
File Reference: Validation of Master weight tally with sum of HBLs weight
Status:
Closed
Priority:
Normal
Assignee:
-
Start date:
12/04/2024
Due date:
05/30/2025
% Done:
100%
Estimated time:
8:00 h
GitLab ID:
1621
GitLab Milestone:
GitLab Ticket Number:
508
GitLab Time Logged:
0
Lock Timeline Date:
No
gitlab project trace:
Ocean Sprint Planning for 19/05/2025 - 30/05/2025
Description
Description
Screen: File Reference
- Under Section Master Bill of Lading Info: Weight(Kg)
- Under HBL details: Weight(Kg)
-
Master Bill of Lading weight validation:
- The system shall retrieve the total weight from all associated HBLs linked to a master shipment.
- After adding the HBL, Do a Save
- If the calculated total weight of all HBL does not match the master weight, the system shall display a warning message in RED to the user. ' Total Master BL weight and Sum of all HBL weight do not tally'
-
Automatic Calculation of Master Chargeable Weight:
- The system shall automatically calculate the master chargeable weight by summing the chargeable weights of all associated HBL
-
Notifications:
- Question: Should the discrepancy be send to the client?
GitLab Sync Log
[]
Updated by Redmine Admin 5 months ago
- Status changed from New to Closed
- % Done changed from 0 to 100