Task #16742
openTask #16343: Sprint Planning for 03/02/2025 - 17/02/2025
File Reference - Shipping Instructions (COLOADED AND NON COLOADED)
100%
Description
Points discussed with CPworld , Silverline on 21/01/25
o LCL or Co-Loaded HBLs: SI can be generated at any point in the lifecycle, and the PDF should exclude container references since FFWD may not have the correct container information at that stage.
o FCL or Non-Co-Loaded HBLs: SI should only be generated after the Release Order is received, and the container is picked up and updated in FFS.
GitLab Sync Log
[{"id": "16185", "author": "Vishesh Jodhoa", "hours": 2.0, "created": "2025-02-20T09:26:58.353Z", "log_date": "2025-02-20", "comment": "Imported from GitLab by @Vishesh Jodhoa on 2025-02-20T09:26:58.353Z: 2h-(2.0)h spend at: 2025-02-20", "status": "active", "deleted_by": "", "redmine_entry_id": 8167}, {"id": "15405", "author": "Vishesh Jodhoa", "hours": 4.0, "created": "2025-02-10T10:14:39.337Z", "log_date": "2025-02-10", "comment": "Imported from GitLab by @Vishesh Jodhoa on 2025-02-10T10:14:39.337Z: 4h-(4.0)h spend at: 2025-02-10", "status": "active", "deleted_by": "", "redmine_entry_id": 8168}]