Project

General

Profile

Actions

Task #16742

open

Task #16343: Sprint Planning for 03/02/2025 - 17/02/2025

File Reference - Shipping Instructions (COLOADED AND NON COLOADED)

Added by Redmine Admin 7 months ago. Updated about 1 hour ago.

Status:
QA
Priority:
Normal
Assignee:
-
Start date:
02/03/2025
Due date:
02/17/2025 (about 10 months late)
% Done:

100%

Estimated time:
4:00 h
Spent time:
GitLab ID:
1878
GitLab Milestone:
GitLab Ticket Number:
621
GitLab Time Logged:
21600
Lock Timeline Date:
No
gitlab project trace:
Sprint Planning for 03/02/2025 - 17/02/2025

Description

Points discussed with CPworld , Silverline on 21/01/25

o LCL or Co-Loaded HBLs: SI can be generated at any point in the lifecycle, and the PDF should exclude container references since FFWD may not have the correct container information at that stage.

o FCL or Non-Co-Loaded HBLs: SI should only be generated after the Release Order is received, and the container is picked up and updated in FFS.


GitLab Sync Log

[{"id": "16185", "author": "Vishesh Jodhoa", "hours": 2.0, "created": "2025-02-20T09:26:58.353Z", "log_date": "2025-02-20", "comment": "Imported from GitLab by @Vishesh Jodhoa on 2025-02-20T09:26:58.353Z: 2h-(2.0)h spend at: 2025-02-20", "status": "active", "deleted_by": "", "redmine_entry_id": 8167}, {"id": "15405", "author": "Vishesh Jodhoa", "hours": 4.0, "created": "2025-02-10T10:14:39.337Z", "log_date": "2025-02-10", "comment": "Imported from GitLab by @Vishesh Jodhoa on 2025-02-10T10:14:39.337Z: 4h-(4.0)h spend at: 2025-02-10", "status": "active", "deleted_by": "", "redmine_entry_id": 8168}]

Actions #1

Updated by Redmine Admin 7 months ago

  • GitLab Sync Log updated (diff)
Actions

Also available in: Atom PDF