Project

General

Profile

Task #18435

Updated by Redmine Admin 6 months ago

**Purpose of this user story**: 

 On a vessel / Vessel schedule, we can have one or multiple shipments.  

 Example:  

 MSC IBERIS - (Linked to a Master File Ref - Already Exists) 

 * Shipment 1 - (Sub File - Presently shown as 122, 123) 
 * Shipment 2 

 ![image.png](/uploads/df4e823742bb9cdbf1dd394c400a05af/image.png){width=926 height=137} 

 **Why we need this?** 

 A File reference should be link to a shipment only not Kindly note that the overall vessel. 

 **What problem we are facing right now**? 

  All Cost and Sales / Volume are being merged together when having multiple shipments on a vessel. 

 **How we are addressing the problem with this user story?** 

 We should take into consideration an additional layer know as 'Shipment' (where the ref 122 represents a shipment). 

 The structure of Both Import / Export Consignment should read as per Below. 

 1. Vessel - Linked with a Unique Master Reference (we already have). Reference. 

    (a) Shipment - A vessel can contain one or multiple shipment and each shipment shall be covered by a Booking number / or Master BL number. 
 2. Only one file reference shall be used per shipment. 
 3. Cost and sales to be calculated 'Per shipment'. 

 For any Additional information, concerning the subject please reach out to me

Back