Project

General

Profile

Actions

Task #16400

closed

Task #16394: Sprint Planning 30/09/2024 - 18/10/2024

BE - File reference: Design a new screen to manage multiple HBLs for an FCL

Added by Redmine Admin 7 months ago. Updated about 1 hour ago.

Status:
Closed
Priority:
High
Assignee:
-
Start date:
10/15/2024
Due date:
10/15/2024
% Done:

100%

Estimated time:
0:00 h
Spent time:
GitLab ID:
1435
GitLab Milestone:
GitLab Ticket Number:
200
GitLab Time Logged:
28800
Lock Timeline Date:
No
gitlab project trace:
Sprint Planning 30/09/2024 - 18/10/2024

Description

Description

As a Freight Forwarder,
I want to manage a Full Container Load (FCL) shipment that includes multiple Containers for a House Bill of Lading (HBL).

Acceptance Criteria:

  1. Create FCL Shipment:
    • The system should allow the creation of a new FCL and use of existing quotation.
    • The user can input details such as Port of loading, final destination, weight, number of packages, goods description.
    • Each FCL includes details such as shipper, consignee, cargo description, weight, and volume.
    • User should be able to add Sales charge
  2. Add Multiple containers to 1 Bill of Lading ( BL):
    • The user should be able to add multiple containers to 1 Bill of Lading( BL)
    • Each BL includes same details as FCL such as shipper, consignee, cargo description, weight, and volume.
    • User should be able to add Sales charge
  3. Track Individual HBLs:
    • The user should be able to search by container ref.
  4. Notifications:
    • Notification is sent to the Agent and the client upon approval.

GitLab Sync Log

[{"id": "10970", "author": "Avisham", "hours": 8.0, "created": "2024-11-07T06:52:11.377Z", "log_date": "2024-11-07", "comment": "Imported from GitLab by @Avisham on 2024-11-07T06:52:11.377Z: 1d-(8.0)h spend at: 2024-11-07", "status": "active", "deleted_by": "", "redmine_entry_id": 7902}]

Actions #1

Updated by Redmine Admin 7 months ago

  • GitLab Sync Log updated (diff)
Actions #2

Updated by Redmine Admin 5 months ago

  • Status changed from QA to Closed
  • % Done changed from 0 to 100
Actions

Also available in: Atom PDF