Project

General

Profile

Actions

Task #16389

closed

Task #16379: Sprint Planning for 10/12/2024 - 31/12/2024 Import/Export

BE - Controller, Service , Repository and Model for clearing

Added by Redmine Admin 7 months ago. Updated about 2 hours ago.

Status:
Closed
Priority:
Normal
Assignee:
-
Start date:
11/14/2024
Due date:
11/14/2024
% Done:

100%

Estimated time:
80:00 h
Spent time:
GitLab ID:
1547
GitLab Milestone:
GitLab Ticket Number:
210
GitLab Time Logged:
266400
Lock Timeline Date:
No
gitlab project trace:
Sprint Planning for 10/12/2024 - 31/12/2024 Import/Export

Description

Fields that should be displayed on Clearance Report

  • Date
  • Importer Name
  • Shipper
  • Contact Person
  • Telephone number
  • Mobile number
  • Fax
  • Email Address
  • Address
  • Vessel Name
  • Vessel number
  • Vessel Nationality
  • Report number
  • Report Date
  • Bill of Lading (BL)
  • Number of Packages
  • No of Containers (How many containers are there)
  • Container Numbers (E.g.: ML ZA6134563)
  • Country of Origin
  • Add Country of Destination
  • Add Incoterm
  • Add Port of Loading (For Export, Default Port of Loading is Mauritius)
  • Add Port of Unloading (For Import, default port of Unloading is Mauritius)
  • Container Type (Container type = FCL, Container number and Seal number should be added. Container type = LCL, Container number, No of Pieces, Weight or volume). For an LCL seal number is not mandatory.
  • 'Place of Lading' should be replaced by 'Place of Landing Shipping'
  • Add field 'Storage Area' for warehouse
  • Marks and Numbers
  • Prepared By (A less experienced Agent fills the form)
  • Processed By (An experienced Agent gives approval or rejects)
  • When document is being Prepared by there is no Bill of Entry, Once Processed by is Approved, we get a Bill of Entry.)
  • Document received (This is not mandatory at RFQ, but when processed it is a mandatory field)
  • Add 2 checkboxes for 'Scan' and 'Exam' (Example: Same person can do verification and Scan. if all good it can release the item)
  • Missing Document
  • Replace 'Freight' by 'Basic Freight'
  • Add field 'Other Charges'
  • Add field Post of Entry
  • Add Dispatch Verification date range (from - to)
  • Dispatch location
  • Dispatch Date
  • Add Dispatch Remarks fields
  • Rename 'delivery done on' to 'Client Delivery'
  • Add a label using the type of component ([Angular Tag Component] (https://www.primefaces.org/primeng-v16-lts/tag))

GitLab Sync Log

[{"id": "13140", "author": "Ra-ees Peeroo", "hours": 16.0, "created": "2025-01-10T07:20:46.717Z", "log_date": "2025-01-02", "comment": "Imported from GitLab by @Ra-ees Peeroo on 2025-01-10T07:20:46.717Z: 2d-(16.0)h spend at: 2025-01-02", "status": "active", "deleted_by": "", "redmine_entry_id": 7893}, {"id": "12713", "author": "Ra-ees Peeroo", "hours": 56.0, "created": "2024-12-24T05:15:31.932Z", "log_date": "2024-12-10", "comment": "Imported from GitLab by @Ra-ees Peeroo on 2024-12-24T05:15:31.932Z: 1w 2d-(56.0)h spend at: 2024-12-10", "status": "active", "deleted_by": "", "redmine_entry_id": 7894}, {"id": "26593", "author": "Yashvee Seetul", "hours": 2.0, "created": "2025-07-11T10:14:06.027Z", "log_date": "2025-07-10", "comment": "Imported from GitLab by @Yashvee Seetul on 2025-07-11T10:14:06.027Z: 2h-(2.0)h spend at: 2025-07-10", "status": "active", "deleted_by": "", "redmine_entry_id": 9922}]

Actions #1

Updated by Redmine Admin 7 months ago

  • GitLab Sync Log updated (diff)
Actions #2

Updated by Redmine Admin 5 months ago

  • GitLab Time Logged changed from 259200 to 266400
  • Status changed from QA to Closed
  • % Done changed from 90 to 100
Actions #3

Updated by Redmine Admin 5 months ago

  • GitLab Sync Log updated (diff)
Actions

Also available in: Atom PDF